Engineered Water Systems Changsha Β· China info@kertonewater.com Tel: +86 193 7519 4365
Technical Resources

Current documents
for active projects.

Request product datasheets, CAD interface files, certification evidence or a selection guide. The team checks the model and revision before sending applicable documents.

RVerified Revision
Email Delivery
PDF

Product Datasheets

Model-specific specifications supplied after the relevant series and configuration are confirmed.

CAD

Interface & Layout Files

Interface, plant-room and distribution information supplied for the applicable project stage.

ISO

Certification Evidence

Certificate names, scope and validity follow the originals; publicly reviewed evidence is also available on the Qualifications page.

View Qualifications β†—
GUIDE

Selection Guide

A preliminary selection framework based on application, feed water, capacity, electrical supply and destination.

Documents support project evaluation; final specifications follow the approved technical agreement.

Water Treatment Selection Guide

  1. Define the application and water-quality acceptance criteria.
  2. Provide a recent feed-water analysis and confirm the available utilities.
  3. Specify average and peak demand, daily consumption and points of use.
  4. Confirm space, distribution distance, storage, circulation and maintenance access.
  5. Agree the monitoring, disinfection, commissioning and ongoing service plan with the engineering team.

Product documents are supplied on request after model and configuration confirmation; this page does not claim that unverified files are available for direct download.

Request the current revision

Kertone technical resources are supplied according to the product model and project use. Historical brochures that contain old contact details, outdated parameters or superseded revisions are not offered as direct public downloads. To request the latest PDF product information, email info@kertonewater.com. The technical-resource form may be used to provide preliminary requirements; after checking the product, intended use and revision, the team can communicate and send an applicable current file through the business email channel when it is available.

Resources that may be requested

  • A product data sheet or selection information for a specified model;
  • Installation, utility or interface information needed for a project;
  • Copies of current qualification documents applicable to the product and target market, where available;
  • Application information for preliminary project discussion.

Not every document type applies to every product, territory or project. The document name, language, scope and revision are confirmed after the request is reviewed. Detailed designs, drawings, prices or contractual attachments may require additional project information or separate written confirmation.

What to include in a request

  • Your name, company and business email address;
  • Country or region and project destination;
  • Product, model or resource type of interest;
  • Application, target capacity and target water quality;
  • Known feed-water conditions;
  • Site voltage, frequency and phase;
  • Other site conditions or document requirements.

Complete information helps identify the appropriate revision. Do not send passwords, payment information, patient data or unrelated sensitive information through a general request form.

Revision and use boundaries

The model, revision and scope stated inside a PDF govern its use. A historical file, forwarded copy or third-party copy may be obsolete and should not be used by itself for purchasing, installation, acceptance or changes to operating parameters. If a website resource differs from a project document, the latest agreed technical specification, drawing, written quotation, purchase order or contract governs.

Request handling

Current PDF resources are requested and supplied by email; they are not automatic downloads. Availability, language and scope depend on the product, intended use, destination market and current document status; the website does not promise one delivery time for every request. Request information is used to identify the resource, respond and conduct necessary project follow-up. See the Privacy Policy for details.

Request technical resources: info@kertonewater.com

Not sure which document applies?

Submit the application, capacity and feed-water conditions; the engineering team will confirm the applicable revision and reply with the selection guide.

Request the selection guide β†—

Read the Cookie Policy Β· Privacy Information